Taishan Construction gold mountain mark
TAISHANCONSTRUCTION
Prepared forJack
Project56 Larkmead Crescent Exterior Transformation
ProposalTS-2026-LARK-56
Scope for pricing56 Larkmead Crescent, Vaughan, Ontario
Drawing: 3D Visualization Package
Front elevation render of 56 Larkmead Crescent with new interlock driveway

Prepared for Jack by Taishan Construction

56 Larkmead Crescent Exterior Transformation

A complete front and backyard transformation,
designed before construction begins.

56 Larkmead Crescent, Vaughan, OntarioPrepared today

Private proposal

Prepared exclusively for this project.

Prepared for Jack at 56 Larkmead Crescent. Each service below is priced as a complete lump-sum investment, and your project total updates as you confirm your selections.

Taishan Construction gold mountain mark
TAISHANDesign-First Exterior Transformation
Proposal statusDesign Review
Prepared forJack
Prepared byTaishan Construction
Site address56 Larkmead Crescent, Vaughan, Ontario
Reference3D Visualization Package
Front yardInterlock driveway, walkway & garden bed
BackyardGrading, sodding & tree removal
Renders included18 visualizations
Estimated duration7 – 10 days
Last checkedChecking secure access…
Proposal IDTS-2026-LARK-56
Project total$25,545.00
VersionV1 — Design Review

3D visualization

See it before you build it.

Front driveway, walkway, entrance detailing, backyard deck and fence line — visualized before construction begins.

Before and after

Your property, then and after.

Existing site photography paired side by side with the corrected-scale front yard renders.

Porch visualizer — August 9th

Your porch, finish by finish.

The latest issue of your porch visualization package — composite deck and stairs alongside the porcelain porch finish.

Project approach

How Taishan Construction delivers this scope.

A disciplined sequence from mobilization to turnover, coordinated with Jack.

01

See it before you build it

Jack's driveway, walkway, garden bed and rear yard visualized in 3D before construction begins at 56 Larkmead Crescent.

02

Built properly beneath the surface

Proper excavation, subgrade inspection, geotextile, compacted base and controlled grading beneath every hardscape area.

03

Clear scope, clean execution

Each service is presented as a complete lump sum, so Jack knows exactly what is included before we mobilize.

04

Inspected and turned over

Paver stability, grading, curb, sod and finished edges inspected, deficiencies corrected and a final walkthrough completed with Jack.

Scope of work

Build your project scope.

Each service is priced as a complete lump sum. Select the services you would like included and your project total updates instantly. Estimated 7 – 10 day construction schedule.

Driveway surface — choose one

Select your driveway surface.

Four driveway finishes are available for approximately 760 sq. ft. Selecting one automatically replaces the others, and your project total updates immediately.

Regrading of the front yard to establish positive drainage away from the foundation and new hardscape, including topsoil placement, shaping and final raking.

  • Removal of unsuitable surface material within the grading area
  • Placement and shaping of topsoil to the required slope
  • Positive drainage established away from the foundation and new hardscape
  • Blending into adjacent walkway, driveway and lawn elevations
  • Final raking and cleanup

Front garden bed — choose one

Select your front garden bed.

Two design levels are available for the front garden bed. Selecting one automatically replaces the other, and your project total updates immediately.

Main porch finish — choose one

Select your main porch finish.

Three finishes are available for approximately 121 sq. ft. of porch area. Selecting one automatically replaces the other two, and your project total updates immediately.

Exterior lighting — configure

Configure your exterior lighting.

Set the quantity of each fixture type independently. Your project total updates immediately.

Recommended 9

Recessed Pot Lights

$1,440.00

Recommended layout of 9 fixtures — 5 along the left side and 4 along the right.

9fixtures
  • Fixture positions confirmed on site with Jack
  • Low-voltage wiring, transformer connection and concealed runs
  • Aiming, testing and final adjustment after dark
Recommended 4

Under-Glow Fixtures

$800.00

Recommended layout of 4 under-glow fixtures washing the step and planter edges.

4fixtures
  • Integrated into the stone and step construction
  • Concealed low-voltage runs and connections
  • Aiming, testing and final adjustment after dark

Investment summary

Investment summary.

Every service is presented as a complete lump-sum investment covering all labour, materials, equipment, disposal and cleanup required for that portion of the work.

Quantities are preliminary and subject to field verification, approved material selections, site access, utility conditions, and confirmation by Jack.

Project total — selected services$25,545.00CAD · updates as your selections change
Interlock Driveway — $11,020.00Front Yard Grading — $1,500.00Frontage Curb — $1,700.00Backyard Grading, Sodding and Tree Removal — $3,800.00Frontage Sodding — $1,500.00Sidewalk Sodding — $525.00Right-Side Walkway — 3/4 Clear Stone with Slabs — $1,500.00Neighbour-Side Weed Cleaning — $500.00Simple Garden Bed — $1,260.00Recessed Pot Lights (9) — $1,440.00Under-Glow Fixtures (4) — $800.00

Construction sequence

A 7 – 10 day construction schedule.

Under normal site, weather, access, and material-delivery conditions.

DAY01

Mobilization and Demolition

Site setup, staging areas, removal of existing surfaces and disposal of debris.

DAY02

Excavation and Subgrade

Driveway and walkway excavation, subgrade inspection, fine grading and compaction.

DAY04

Base and Frontage Curb

Geotextile, aggregate and clear stone base placement, curb installation and elevation verification.

DAY06

Interlock and Walkway

Driveway interlock installation, border banding, right-side walkway slabs and jointing.

DAY09

Grading, Garden Bed and Sod

Front and rear grading, garden bed construction, tree removal, sodding, weed cleaning, cleanup and turnover.

Review and confirmation

Scope review
with Jack

Please review your selected services above and confirm the scope, material selections and site conditions. Your project total reflects the services currently selected.

Note: All quantities are preliminary and subject to field verification, approved material selections, site access, utility conditions, and confirmation by Jack.

Questions? Contact Jeff directly.
Approximate driveway area760 sq. ft. (field verification required)
Front yardInterlock driveway, walkway, garden bed and grading
Rear yardGrading, sodding and tree removal
Estimated durationApprox. 7 – 10 working days
Reference3D Visualization Package
Driveway surfaceInterlock Driveway
Front garden bedSimple Garden Bed
Main porch finishNot selected
Project total — selected services$25,545.00
Exterior lighting9 × Recessed Pot Lights · 4 × Under-Glow Fixtures
Estimated startTo be confirmed